MUPBED Deliverable D0.1: Project Summary MUPBED Deliverable D0.2: Plan for using and disseminating knowledge for the first 18 months MUPBED Deliverable D0.3: Plans for dissemination and horizontal activities MUPBED Deliverable D0.4: Dissemination and horizontal activities in year 1 MUPBED Deliverable D0.5: Dissemination and horizontal activities in the first 18 months (includes MUPBED Deliverable D0.5a: Updated dissemination plan for year 2) MUPBED Deliverable D0.6: Dissemination and horizontal activities in year 2 MUPBED Deliverable D0.7: Dissemination and horizontal activities in last phase (July 2006 - September 2007) MUPBED Deliverable D1.1: Preliminary definition of a reference architecture for an intelligent optical network MUPBED Deliverable D1.2: Revision of the reference architecture according to the results of the project studies MUPBED Deliverable D1.3: Preliminary analysis of the results of the project experimental activities MUPBED Deliverable D1.4: Final analysis of the experimental results and guidelines for the development of future European Research Networks MUPBED Deliverable D2.1: Definition of application needs and scale of dynamics in research network infrastructures MUPBED Deliverable D2.1a: Definition of application needs and scale of dynamics in research network infrastructures. Additional deliverable on modelling topics MUPBED Deliverable D2.2: Preliminary interface specification MUPBED Deliverable D2.3: Specification on application enhancement procedures for selected applications to be verified in the MUPBED test bed MUPBED Deliverable D2.4: Preliminary results on the performance of the interface between the MUPBED applications and the network control MUPBED Deliverable D2.5: Final results on application- network interface on the MUPBED test bed MUPBED Deliverable D3.1: Test Bed Overview (replaced by later documents D3.2 - D3.5) MUPBED Deliverable D3.2: Report on enhanced design and architecture of the local test beds MUPBED Deliverable D3.3: Report on interconnection and integration of local test beds MUPBED Deliverable D3.4: Preliminary report on MUPBED test bed integration, interworking and operation MUPBED Deliverable D3.5: Final report on MUPBED test network integration, inter-working and operation MUPBED Deliverable D4.1: Preliminary plan for demonstrations to be performed in test bed experiments during the first half of IP MUPBED MUPBED Deliverable D4.2: Demonstrations performed in the MUPBED test bed year 1 MUPBED Deliverable D4.3: Preliminary plan for demonstrations to be performed in test bed experiments (2nd half) MUPBED Deliverable D4.4: Demonstrations performed in the MUPBED test bed year 2 MUPBED Deliverable D4.5: Demonstrations performed in the MUPBED test beds Year 3